| Spirit entered Brisbane Marina under the skippership of Steve and Marsha Sears on January 5, 1992. | |||||||||||||||||||
| The following, whatever it ends up being called, is the account of what two mechanical engineers that | |||||||||||||||||||
| went from automotive engineering into the fields of computer science did after purchasing a used cruising | |||||||||||||||||||
| sailboat that had been cruised by two previous owners, the first - a doctor at least to Hawaii, and the | |||||||||||||||||||
| second, a lawyer - at least to the South Pacific. For now I'll call it the Enhancement and Repair log... | |||||||||||||||||||
| Spirit's Enhancement and Repair Log | |||||||||||||||||||
| 1/9/1992 | Lewis rebuilt the male end of the power cord | ||||||||||||||||||
| 1/11/1992 | Dave Mills installed the drink holder (from Moonshot) | ||||||||||||||||||
| 1/18/1992 | Lewis took the main reef wench home to rebuild | ||||||||||||||||||
| 1/19/1992 | Lewis and Lewis installed tell tales on the sails | ||||||||||||||||||
| 1/19/1992 | Installed the paper towel holder (from Moonshot) | ||||||||||||||||||
| 1/25/1992 | Installed the medicine cabinet in the forward cabin (from Moonshot) | ||||||||||||||||||
| 1/25/1992 | Moved the mirror on the back of the door to the head up higher | ||||||||||||||||||
| 1/25/1992 | Installed the brass clock and barometer (gift from mom and dad - from Moonshot) | ||||||||||||||||||
| 2/2/1992 | Installed a new propane tank (replaced old one) | ||||||||||||||||||
| 2/2/1992 | Installed a solar vent in the cockpit (the hole had already been cut for a speaker) Jim helped (from Moonshot) | ||||||||||||||||||
| 2/2/1992 | Added a canvas propane canister storage bag for the grill (from Moonshot) | ||||||||||||||||||
| 2/8/1992 | Added a wincher self tacker to the main sheet winch | ||||||||||||||||||
| 2/8/1992 | Replaced missing starboard toe rail track ends | ||||||||||||||||||
| 2/9/1992 | Replaced switch in the circular florescent light over the nav station | ||||||||||||||||||
| 2/15/1992 | Installed Macintosh computer system (from Lewis) | ||||||||||||||||||
| 2/15/1992 | Installed Cybernet Stereo System (from Moonshot) | ||||||||||||||||||
| 2/16/1992 | Installed Loran-C System (from Moonshot) | ||||||||||||||||||
| 2/17/1992 | Marsha purchased a used Sailrite/Brother Sewing Machine | ||||||||||||||||||
| 2/22/1992 | Installed vent on propane grill | ||||||||||||||||||
| 2/22/1992 | Purchased a 250 watt inverter | ||||||||||||||||||
| 2/23/1992 | Lewis took the 2 HP Suzuki outboard engine home to rebuild | ||||||||||||||||||
| 3/2/1992 | Installed the anchor wash down system | ||||||||||||||||||
| 3/7/1992 | Replaced the 50 amp power receptacle with a 30 amp one | ||||||||||||||||||
| 3/7/1992 | Purchased a 30 amp power cord for shore power | ||||||||||||||||||
| 3/7/1992 | Installed the EPIRB (from Moonshot) | ||||||||||||||||||
| 3/7/1992 | Brought the nautical books for the bookshelves (from Moonshot) | ||||||||||||||||||
| 3/8/1992 | Began studying (planning) a holding tank installation | ||||||||||||||||||
| 3/20/1992 | Trimmed inflatable dinghy floor boards (from Moonshot) | ||||||||||||||||||
| 3/22/1992 | Test drove the rebuilt 2 HP Suzuki outboard motor (Thanks Lewis!) | ||||||||||||||||||
| 3/22/1992 | Marsha completed making new curtains | ||||||||||||||||||
| 3/22/1992 | Marsha completed making binnacle/wheel cover | ||||||||||||||||||
| 3/28/1992 | Brought snorkeling gear, speargun, machete, and bolt cutters (from Moonshot) | ||||||||||||||||||
| 3/29/1992 | Installed telephone, modem, and answering machine | ||||||||||||||||||
| 3/31/1992 | Phone service hooked up | ||||||||||||||||||
| 4/4/1992 | Marsha sewed elastic into the main salon slip covers | ||||||||||||||||||
| 4/4/1992 | Oiled anchor and driveshaft with LPS3 | ||||||||||||||||||
| 4/4/1992 | Installed fishing rod holders, rods, and stowed fishing tackle (from Moonshot) | ||||||||||||||||||
| 4/10/1992 | Adjusted (figured out and) shaft brake | ||||||||||||||||||
| 4/12/1992 | Changed home port to San Francisco | ||||||||||||||||||
| 4/12/1992 | Added 200' line and chain to anchor locker (after cleaning it out) (probably from Moonshot) | ||||||||||||||||||
| 4/26/1992 | Replaced deck fitting for waste | ||||||||||||||||||
| 4/26/1992 | Began Autopilot installation (Josh from Moonshot) | ||||||||||||||||||
| 5/10/1992 | Salvaged and repaired fiberglass dinghy that was about to go up on the rocks of Treasure Island on a heavy weather outing with Lewis | ||||||||||||||||||
| 5/10/1992 | Lewis adjusted the fuel mix on the 2 HP Suzuki, it runs | ||||||||||||||||||
| 5/15/1992 | Had working jib repaired | ||||||||||||||||||
| 5/17/1992 | Replaced the pull starter cord on the 6 HP Johnson Outboard (from the Aquarius) | ||||||||||||||||||
| 5/17/1992 | Added Alladen Cleat Lifeline System (3rd lifeline through cleat eye on shrouds) | ||||||||||||||||||
| 5/17/1992 | Installed 12 Volt outlet for TV | ||||||||||||||||||
| 5/17/1992 | Replaced the sail ties | ||||||||||||||||||
| 6/13/1993 | Installed throttle cable clamp | ||||||||||||||||||
| 6/27/1992 | Brought last of sorted boat stuff from home (I think this means stuff from Moonshot usable on Spirit) | ||||||||||||||||||
| 6/28/1992 | Installed Burgee Halyard | ||||||||||||||||||
| 6/28/1992 | Finished installing fire hose rubrail protector on hard dinghy | ||||||||||||||||||
| 6/28/1992 | Rebuilt Head | ||||||||||||||||||
| 6/28/1992 | Fine tuned the adjustment on the throttle cable clamp | ||||||||||||||||||
| 6/28/1992 | Marsha prepped and put first coat of paint on hard dinghy | ||||||||||||||||||
| 7/1/1992 | Lewis returns Suzuki with timing adjusted | ||||||||||||||||||
| 7/3/1992 | Brought the portable Fish Finder (from Moonshot) (co-owned with Jim) | ||||||||||||||||||
| 7/3/1992 | Second coat of white paint on dinghy | ||||||||||||||||||
| 7/3/1992 | Painted air scoops | ||||||||||||||||||
| 7/18/1992 | Serviced engine, Oil and Gas Filters, new Thermostat | ||||||||||||||||||
| 7/19/1992 | Designed holding tank system, need to find right tank | ||||||||||||||||||
| 7/19/1992 | Debugged problem with lower running light system, needs parts | ||||||||||||||||||
| 7/19/1992 | Found location for auxiliary 12 Volt switch panel | ||||||||||||||||||
| 7/25/1992 | Implemented holding tank system with pump out | ||||||||||||||||||
| 8/1/1992 | Rebuilt holding tank pump | ||||||||||||||||||
| 8/1/1992 | Installed Chute Scoop on Spinnaker | ||||||||||||||||||
| 8/1/1992 | Replaced deck level stern running light lens | ||||||||||||||||||
| 8/1/1992 | Installed towel bars in shower | ||||||||||||||||||
| 8/8/1992 | Relocated Aladdin Cleats for extra life line | ||||||||||||||||||
| 8/8/1992 | Marsha stripped starboard rub rail varnish | ||||||||||||||||||
| 8/8/1992 | Installed Auxiliary switch panel, hooked up running lights | ||||||||||||||||||
| 8/8/1992 | Rigged jib downhaul | ||||||||||||||||||
| 8/8/1992 | Marsha installed hinges on instrument panel cover | ||||||||||||||||||
| 8/8/1992 | Rigged jib tie down system | ||||||||||||||||||
| 8/8/1992 | Rigged line for mizzen reef | ||||||||||||||||||
| 8/8/1992 | Installed life line netting | ||||||||||||||||||
| 8/8/1992 | Rigged main manual bilge pump | ||||||||||||||||||
| 8/8/1992 | Greased primary winches | ||||||||||||||||||
| 8/8/1992 | Cleaned engine sea water strainer | ||||||||||||||||||
| 8/9/1992 | Located wind generator wiring | ||||||||||||||||||
| 8/15/1992 | Redid thermostat install because of leak, new gasket | ||||||||||||||||||
| 8/16/1992 | Finished designing and implementing jib downhaul | ||||||||||||||||||
| 8/22/1992 | Installed new port and starboard running lights | ||||||||||||||||||
| 8/22/1992 | Hooked new running lights to wind generator wiring, old wire was bad | ||||||||||||||||||
| 8/22/1992 | Put keyed alike locks on cockpit lazeretts | ||||||||||||||||||
| 8/29/1992 | Cleaned mildew in V Berth | ||||||||||||||||||
| 8/29/1992 | Started making stanchion mounting plate underside accessible for pending recaulk project | ||||||||||||||||||
| 8/30/1992 | Took apart and prepared stanchion over head for redo | ||||||||||||||||||
| 8/30/1992 | Made a diagram of all sea cocks | ||||||||||||||||||
| 8/30/1993 | Purchased handheld VHF radio, Standard Model HX230S | ||||||||||||||||||
| 8/30/1992 | Made sketches for dock step / box | ||||||||||||||||||
| 8/30/1992 | Started thinking about Electrical System and adding a starter battery | ||||||||||||||||||
| 9/1/1992 | New Cushions installed in V Berth, Peninsula Canvas, High Density Foam like first class airline seats | ||||||||||||||||||
| 9/1/1992 | Put epoxy in stanchion opening (over head compartment) | ||||||||||||||||||
| 9/5/1992 | Marsha stripped varnish on starboard toe rail | ||||||||||||||||||
| 9/5/1992 | Installed hand held VHF Radio on back of cockpit table | ||||||||||||||||||
| 9/5/1992 | Caulked and reinstalled stanchion over head compartment | ||||||||||||||||||
| 9/6/1992 | Completed construction of dock step box (started 8/31/92) | ||||||||||||||||||
| 9/6/1992 | Rigged mizzen preventer | ||||||||||||||||||
| 9/6/1992 | Rigged large block and tackle for Spinnaker pole downhaul | ||||||||||||||||||
| 9/12/1992 | Marsha rigged galley belt | ||||||||||||||||||
| 9/12/1992 | Marsha repaired grill cover | ||||||||||||||||||
| 9/13/1992 | Marsha made canvas covers for the handrails on deck | ||||||||||||||||||
| 9/19/1992 | Replaced forward hatch cover | ||||||||||||||||||
| 9/19/1992 | Marsha stripped much of the port rub and toe rails | ||||||||||||||||||
| 9/19/1992 | Researched autopilot, need to order a sensitivity resister | ||||||||||||||||||
| 9/20/1992 | Deployed awning in cockpit, Installed quick deploy system | ||||||||||||||||||
| 9/20/1992 | Marsha completed design and prototype phase for bean bags | ||||||||||||||||||
| 9/26/1992 | Marsha completed 2 great boat bean bags | ||||||||||||||||||
| 9/26/1992 | Marsha retrofitted old wheel cover to be cover for Johnson 6 outboard | ||||||||||||||||||
| 9/26/1992 | Added SPIRIT lettering to hard dinghy and dock step | ||||||||||||||||||
| 9/26/1992 | Added non skid strips to dock step box | ||||||||||||||||||
| 9/26/1992 | Rigged rigging mount Boatenna TV Antenna | ||||||||||||||||||
| 9/26/1992 | Designed and commissioned Dave Henderson to build a mount for a bigger winch for the main reefing system | ||||||||||||||||||
| 10/3/1992 | Installed knob on autopilot sensitivity control | ||||||||||||||||||
| 10/20/1992 | Put camping foam pads under settees in main salon | ||||||||||||||||||
| 10/20/1992 | Installed brass key holder by midship companionway | ||||||||||||||||||
| 10/20/1992 | Analyzed ship's power consumption | ||||||||||||||||||
| 10/20/1992 | Debugged interference in Loran, Radar and Instruments | ||||||||||||||||||
| 10/24/1992 | Replaced galley sink drains | ||||||||||||||||||
| 10/24/1992 | Replaced feed tube in drain system for galley cold water | ||||||||||||||||||
| 10/24/1992 | Installed Seagull IV Drinking water purifier (came with boat not or uninstalled) | ||||||||||||||||||
| 10/25/1992 | Installed spice rack over galley sink (from Moonshot) | ||||||||||||||||||
| 10/25/1992 | Installed 2 bookshelves in the forward end of the V Berth (from Moonshot) | ||||||||||||||||||
| 10/31/1992 | Made the vice mount floor board for aft cabin closet | ||||||||||||||||||
| 10/31/1992 | Marsha made a bulkhead mount canvas pouch system for the compartment under the sink in the head | ||||||||||||||||||
| 11/5/1992 | Installed a battery bag in the dead space above the nave station | ||||||||||||||||||
| 11/5/1992 | Jumpered blown trace fuse in the Loran-C, still debugging noise | ||||||||||||||||||
| 11/7/1992 | Wired VHF extension speaker through stereo | ||||||||||||||||||
| 11/7/1992 | Installed volume control unit onto aft companionway speaker board | ||||||||||||||||||
| 11/7/1992 | Moved VHF extension speaker into nav station | ||||||||||||||||||
| 11/7/1992 | Rewired loran-c back together, can't use with radar | ||||||||||||||||||
| 11/8/1992 | Fixed compass cover | ||||||||||||||||||
| 11/8/1992 | Made design sketch for teak box for volume control unit | ||||||||||||||||||
| 11/14/1992 | Marsha stripped more varnish from the port rails | ||||||||||||||||||
| 11/14/1992 | Upgraded reefing winch | ||||||||||||||||||
| 11/15/1992 | Studied ground system and read the Eliminator documentation | ||||||||||||||||||
| 11/15/1992 | Verified sink drains would work | ||||||||||||||||||
| 11/15/1992 | Installed teak volume control box housing | ||||||||||||||||||
| 11/15/1992 | Rerouted VHF Speaker system, A) Speaker in Nav Station, B) Plug into Mic on Stereo for cockpit, need new shielded cable | ||||||||||||||||||
| 11/21/1992 | Installed winchers on rest of winches | ||||||||||||||||||
| 11/21/1992 | Deployed zinc guppy | ||||||||||||||||||
| 11/21/1992 | Installed a force 10 propane grill | ||||||||||||||||||
| 11/21/1992 | Added a 25' extension cord to phone | ||||||||||||||||||
| 11/25/1992 | Installed alcohol heater for when there is no electricity | ||||||||||||||||||
| 12/24/1992 | Had new cushions for main Salon made | ||||||||||||||||||
| 12/31/1992 | Bought a Coleman Halogen Spotlight | ||||||||||||||||||
| 1/8/1993 | Hung the picture, gift from Gita, in Head | ||||||||||||||||||
| 1/10/1993 | Added Mast Mate with but pack belt | ||||||||||||||||||
| 1/31/1993 | Installed Starter Battery with AMPLE Power Eliminator | ||||||||||||||||||
| 1/31/1993 | Marsha cleaned the galley hatches | ||||||||||||||||||
| 1/31/1993 | Installed cup hooks for coffee cups | ||||||||||||||||||
| 1/31/1993 | Reorganized Galley shelf space | ||||||||||||||||||
| 2/4/1993 | Ordered new pair of Cybernet speakers and decided on their location | ||||||||||||||||||
| 2/6/1993 | Purchased and started reading the literature, Smart Alternator Regulator | ||||||||||||||||||
| 2/6/1993 | Purchased and started reading the literature, Bank Manager | ||||||||||||||||||
| 2/6/1993 | Had PME make teak plate for replacing the old charge voltage rheostat with the Bank Manager 2 control | ||||||||||||||||||
| 2/9/1993 | Order a high output alternator from Everfair | ||||||||||||||||||
| 2/15/1993 | Removed and disassembled the manual windless from the foredeck | ||||||||||||||||||
| 2/16/1993 | Ordered parts for windless rebuild | ||||||||||||||||||
| 2/19/1993 | Took delivery of the high output alternator | ||||||||||||||||||
| 2/20/1993 | Got documentation for a power survivor 32 Water maker to start thinking about how and where to install one | ||||||||||||||||||
| 2/21/1993 | Made a stab at debugging manual overboard holding tank pump out, thought I fixed it but didn't | ||||||||||||||||||
| 2/21/1993 | Installed the new set of Cybernet speakers in the main salon | ||||||||||||||||||
| 2/22-25/1993 | Reassembled the windlass with the new parts, including parts that were redesigned (Engineering Changes) | ||||||||||||||||||
| 2/25/1993 | Sorted out the logical design for the alternation / Bank Manager II install | ||||||||||||||||||
| 2/26/1993 | Sorted out the physical design for the alternation / Bank Manager II install | ||||||||||||||||||
| 2/26/1993 | Determined alternator was wrong one, sent back for a replacement | ||||||||||||||||||
| 2/27/1993 | Reinstalled rebuilt windlass | ||||||||||||||||||
| 2/27/1993 | Began wiring BMII / alternator system | ||||||||||||||||||
| 2/27/1993 | Marsha made covers for the bases of the main salon cushions | ||||||||||||||||||
| 3/6/1993 | Completed installing and debugging the Bank Manager II | ||||||||||||||||||
| 3/6/1993 | Marsha made cushion covers for 5 more of the main salon cushions | ||||||||||||||||||
| 3/7/1993 | Attached lanyard to mid ship dorade vent over head | ||||||||||||||||||
| 3/7/1993 | Installed new thermostat gasket correctly, fixed leak | ||||||||||||||||||
| 3/7/1993 | Fixed leak in head with new long screwdriver | ||||||||||||||||||
| 3/11/1993 | Marsha completed cushion covers for main salon | ||||||||||||||||||
| 3/11/1993 | Installed new 100 Amp high output alternator | ||||||||||||||||||
| 3/19/1993 | Finished electrical system debugging | ||||||||||||||||||
| 3/28/1993 | Fixed old Par Jabsco water pump, replaced the switch as a spare pump | ||||||||||||||||||
| 3/28/1993 | Installed new SureFlo, quiet, self priming water pump | ||||||||||||||||||
| 4/3/1993 | Found board to place under screw box | ||||||||||||||||||
| 4/3-4/1993 | Sanded, cleaned, and prepped rub and toe tails | ||||||||||||||||||
| 4/7/1993 | Cleaned and bleached rub and toe rails, final prep | ||||||||||||||||||
| 4/8/1993 | Applied Star Brite Tropical Teak Sealer, Classic Dark, to rub and toe tails, one coat, looks great | ||||||||||||||||||
| 4/8/1993 | Applied two coats color restorer to blue boot stripe | ||||||||||||||||||
| 5/1/1993 | Rerouted stereo yellow wire to ignition battery (I'm sure there was a reason) | ||||||||||||||||||
| 5/1/1993 | Rerouted power wire from BMII to battery | ||||||||||||||||||
| 5/22/1993 | Had a leather strip added to dodger to protect it from the boom (chafe) | ||||||||||||||||||
| 5/28/1993 | Added a bug sprayer shower system | ||||||||||||||||||
| 6/5/1993 | Mounted lazerette retainer springs (later deinstalled, used epoxy to mount spring base, didn't hold. Not having them not a problem) | ||||||||||||||||||
| 6/5/1993 | Replaced Glow Plug switch and stocked a spare | ||||||||||||||||||
| 6/6/1993 | Added a new second pair of 7 x 50 binoculars with a compass | ||||||||||||||||||
| 6/6/1993 | Added a Portable Garmin 75 GPS | ||||||||||||||||||
| 6/13/1993 | Installed GPS in Nav Station | ||||||||||||||||||
| 6/24/1993 | Storage case for force 10 grill | ||||||||||||||||||
| 5/14/1994 | Boat hauled out | ||||||||||||||||||
| 6/19/1994 | Bottom paint, spars painted, new 316 stainless rigging at Anderson's Boatyard in Sausalito | ||||||||||||||||||
| 6/19/1994 | Mast head light upgraded to add anchor and strobe lights | ||||||||||||||||||
| 6/19/1994 | Repacked propshaft stuffing box, 3/16" flax packing | ||||||||||||||||||
| 6/19/1994 | 4 plastic through hull fittings replaced with bronze | ||||||||||||||||||
| 6/19/1994 | Fish finder transducer added to hull | ||||||||||||||||||
| 6/19/1994 | Autohelm 3000 auto pilot added | ||||||||||||||||||
| 6/19/1994 | Varnish removed from cockpit, eyebrows and handrails | ||||||||||||||||||
| 6/19/1994 | Loran antenna replaced | ||||||||||||||||||
| 6/19/1994 | New VHF Antenna | ||||||||||||||||||
| 6/19/1994 | New main, mizzen, jib, and spinnaker halyards | ||||||||||||||||||
| 6/19/1994 | All new cleats on spars | ||||||||||||||||||
| 6/19/1994 | All spar winches cleaned and greased | ||||||||||||||||||
| 6/19/1994 | All new wiring (foam wrapped) in main and mizzen, including 1 spare set in main mast for gadgets yet to be invented | ||||||||||||||||||
| 6/19/1994 | Spreader lights added to mizzen | ||||||||||||||||||
| 6/19/1994 | Windscreen patched and re stitched | ||||||||||||||||||
| 6/19/1994 | Batten pocket repaired on main sail | ||||||||||||||||||
| 6/19/1994 | Retained 1/2 of old rigging as set of spare wires | ||||||||||||||||||
| 6/19/1994 | Fore and back stays, 1 mail upper and 2 lower shrouds, a mizzen upper and lower | ||||||||||||||||||
| 6/19/1994 | Ran GPS wire to cockpit and rigged table mount for it | ||||||||||||||||||
| 6/19/1994 | Replaced table in cockpit | ||||||||||||||||||
| 6/19/1994 | Ran fish finder wire to cockpit | ||||||||||||||||||
| 6/18/1994 | Had 2" of bottom of mast cut off, half moon drain grooves cut in bottom, and a 2" Aluminum mast step fabricated to replace the height | ||||||||||||||||||
| 6/19/1994 | Radar failed to function correctly, technician coming out Monday | ||||||||||||||||||
| 6/19/1994 | New House Batteries, 2 - 4 D | ||||||||||||||||||
| 6/19/1994 | Total Yard Bill = $18,306.26, 8 page recite dated June 17, 1994 | ||||||||||||||||||
| 7/16/1994 | Cleaned cockpit teak and applied Starbrite Tropical Sealer | ||||||||||||||||||
| 7/30/1994 | Radar repaired, the technician stated he preferred these older models to the newer ones | ||||||||||||||||||
| 8/1/1994 | Applied additional coat of Tropical Sealer to all of the external teak | ||||||||||||||||||
| 8/7/1994 | Degreased engine and applied LP2 corrosion preventative to engine and bilge mechanics | ||||||||||||||||||
| 8/7/1994 | Marsha began stripping teak companionway hatch boards | ||||||||||||||||||
| 8/14/1994 | Replaced forward most port port hole inside window | ||||||||||||||||||
| 8/28/1994 | Replaced broken handle on Seagull water purifier | ||||||||||||||||||
| 2/25/1995 | Hood Cruising Spinnaker with dousing sock from Sail Exchange, like new condition, $1,100, Tequila Sunrise, Red, Orange, Yellow, White, 1-1/2 oz Genoa 140 from a Catalina 36 | ||||||||||||||||||
| 2/26/1995 | Installed hatch door over cut out in port settee, for water maker access | ||||||||||||||||||
| 3/4/1995 | Installed antenna splitter for VHF/FM service | ||||||||||||||||||
| 5/7/1995 | New bolts and caulking (polysulfide compound) on all deck mounted stanchions | ||||||||||||||||||
| 5/20/1995 | Installed hatch door over cut out in starboard settee, cleaned water tanks | ||||||||||||||||||
| 7/1/1995 | Replaced aft cabin cushions with a custom futon | ||||||||||||||||||
| 7/2/1995 | Installed PowerSurvivor 35 water maker | ||||||||||||||||||
| 7/9/1995 | Added a new Mizzen Stay Sail, made by Sailrite, colors to match cruising spinnaker | ||||||||||||||||||
| 8/20/1995 | Installed 3 new marine grade fire extinguishers | ||||||||||||||||||
| 8/21-9/13/95 | Applied 5 coats of varnish to interior cabin sole | ||||||||||||||||||
| 10/1/1995 | * | Closed on Sale of house, 22156 Rae Lane, Cupertino, 95014. Moved into the apartment 1480 Crestwood Dr. #1, San Bruno, 94066 | |||||||||||||||||
| 10/12/1995 | Installed new Profurl furling jib system and a 130% Genoa | ||||||||||||||||||
| 11/4/1995 | Replaced toilet | ||||||||||||||||||
| 11/4/1995 | Marsha diagnosed problem with head discharge plumbing | ||||||||||||||||||
| 11/6/1995 | Ordered new main sail with a Dutchman Flaking System and a new mizzen sail | ||||||||||||||||||
| 11/11/1995 | Replaced sink drains and faucets in vanity and head | ||||||||||||||||||
| 11/12/1995 | Replaced shower sump pump | ||||||||||||||||||
| 11/12/1995 | Replaced gate valve with Y valve in head discharge plumbing | ||||||||||||||||||
| 11/12/1995 | Manual overboard discharge system now works | ||||||||||||||||||
| 11/15/1995 | Bay Riggers installed new stay sail stay and the custom tack and head mount fittings they manufactured | ||||||||||||||||||
| 12/2/1995 | Ordered Hard Dodger, started thinking of other canvass projects for California Custom Canvass: mosquito net for companionway and a bimini | ||||||||||||||||||
| 12/3/1995 | Installed new shower faucet combo | ||||||||||||||||||
| 12/3/1995 | Installed new brass kerosene lantern on port forward bulkhead in main salon | ||||||||||||||||||
| 12/9/1995 | Installed new Statpower 1500 watt inverter | ||||||||||||||||||
| 12/10/1995 | Installed wire shelf unit on back of the door under the galley sink | ||||||||||||||||||
| 12/17/1995 | New throw rug for hall by galley | ||||||||||||||||||
| 12/17/1995 | New storage bins for liquor and food hatches | ||||||||||||||||||
| 12/17/1995 | Rigged block and tackle, and rail eyes for main mast running back stays | ||||||||||||||||||
| 12/17/1995 | Replaced metal fuel tank with new plastic one for Johnson 6 outboard motor | ||||||||||||||||||
| 12/17/1995 | Met with Rich of California Custom Canvas, thinking about bimini | ||||||||||||||||||
| 12/26/1995 | Installation of new main and mizzen sails completed | ||||||||||||||||||
| 1/6/1996 | Added espresso / capuchino machine | ||||||||||||||||||
| 1/6/1996 | Added rugs for galley, V-berth, and aft cabin areas | ||||||||||||||||||
| 1/13/1996 | Installed new 44# Bruce anchor to bow roller | ||||||||||||||||||
| 1/13/1996 | Added new Four Winds II wind and trolling generator (not installed yet) | ||||||||||||||||||
| 1/20/1996 | Added another coat of Tropical Sealer to exterior teak | ||||||||||||||||||
| 1/27/1996 | Ran 2 sets of 12 volt wires along starboard wiring track to forepeak, 1 for the wind generator, 1 spare | ||||||||||||||||||
| 1/27/1996 | Replaced tubes to starboard deck drains in head and aft hanging locker | ||||||||||||||||||
| 2/23/1996 | Partially installed propane sniffer in bilge, ran the wires | ||||||||||||||||||
| 2/3/1996 | FINALLY debugged head pump out. Replaced pump with vertical mount ump and cleaned out the plugged vent | ||||||||||||||||||
| 2/10/1996 | Added 4 Solorex MSX-30 Solar Panels, 1.75 Amp each. The Plan is to mount removably, to top of hard dodger being built | ||||||||||||||||||
| 2/10/1996 | Cut tubing from old dodger to fabricate stanchion mounts for solar panels (removable panels mounted on top of new hard dodger) | ||||||||||||||||||
| 2/25/1996 | Hard Dodger and Bimini systems completed | ||||||||||||||||||
| 3/2/1996 | Adjustable solar panel mounts completed | ||||||||||||||||||
| 3/3/1996 | Completed most of the wiring for the new energy system additions | ||||||||||||||||||
| 3/9/1996 | Replaced battery charger | ||||||||||||||||||
| 3/9/1996 | Replaced port cockpit drain tube through aft cabin hatch | ||||||||||||||||||
| 3/10/1996 | Replaced defective solar wind voltage regulator | ||||||||||||||||||
| 3/10/1996 | Added 2 stainless fishing rod holders, mounted on stern pulpit | ||||||||||||||||||
| 3/10/1996 | Replaced port deck drain tube through galley hatch (a bitch) | ||||||||||||||||||
| 3/17/1996 | Purchased new main and mizzen sheets, reef lines, and other control lines | ||||||||||||||||||
| 3/17/1996 | Determined original solar wind voltage regulator was not defective, returned new one to West | ||||||||||||||||||
| 3/17/1996 | Completed propane sniffer installation | ||||||||||||||||||
| 3/23/1996 | Started ICOM IC-M710 SSB Marine Radio installation | ||||||||||||||||||
| 3/23/1996 | Started engine compartment sound proofing installation | ||||||||||||||||||
| 3/24/1996 | Marsha replaced galley and shower portlight screens. I need to get the stripped screw out of the shower frame | ||||||||||||||||||
| 3/30/1996 | Finished SSB installation | ||||||||||||||||||
| 3/30/1996 | Finished sound proofing engine compartment dog house boards. (I wrote no noticeable difference but don't remember that being the case) | ||||||||||||||||||
| 4/19/1996 | Bought boat computer (Apple Duo laptop, with color monitor) | ||||||||||||||||||
| 4/19/1996 | Bought new 10' Zodiac dinghy with the inflatable floor (from Tim's Zodiac, at the boat show) | ||||||||||||||||||
| 4/19/1996 | Bought a Terminal Node Controller for SSB / Computer (a sea going modem) | ||||||||||||||||||
| 4/20/1996 | Bought new jib sheet track fairleads | ||||||||||||||||||
| 4/20/1996 | Installed the other spare winch from Moonshot on port cockpit coaming as backup power for roller furling | ||||||||||||||||||
| 4/20/1996 | Finished replacing all rigging lines | ||||||||||||||||||
| 4/22/1996 | Got other boat computer, (Midwest Micro Windows 95 laptop) | ||||||||||||||||||
| 4/22/1996 | Took Sailrite sewing machine to repair shop to be adjusted | ||||||||||||||||||
| 4/23/1996 | Installed Monitor Windvane | ||||||||||||||||||
| 4/23/1996 | Commissioned Larsen Sails to retrofit old hank on jib as a 95% furling jib with sunbrella | ||||||||||||||||||
| 4/27/1996 | Added sound proofing to the top bulkhead over engine | ||||||||||||||||||
| 4/27/1996 | Added fan to the aft cabin | ||||||||||||||||||
| 4/28/1996 | Added fishing tackle box | ||||||||||||||||||
| 4/30/1996 | Picked up new Zodiac from Tim's home | ||||||||||||||||||
| 5/2/1996 | Installed reworked jib on furling system. The old primary jib was cut off at the reef point, UV protection cloth added. Now a nice San Francisco summer jib | ||||||||||||||||||
| 5/2/1996 | Tested Zodiac inflatable dinghy, stows under fiberglass dinghy. Works great! | ||||||||||||||||||
| 5/2/1996 | Replaced all 3 lead acid batteries with GEL CELL batteries | ||||||||||||||||||
| 5/3/1996 | Removed head liner in main salon, re bedded mast pulpits and pad eye aft of the hatch, just aft of main mast | ||||||||||||||||||
| 5/25/1996 | Sewing machine adjusted and stowed back on board | ||||||||||||||||||
| 5/27/1996 | Finished tuning rigging per instructions from Brian Toss's seminar conducted at West Marine | ||||||||||||||||||
| 5/30/1996 | Get the engine up to snuff project started | ||||||||||||||||||
| 6/2/1996 | Took delivery of Terminal Node Controller and SGC/DSP | ||||||||||||||||||
| 6/7/1996 | Replaced lights in the aft cabin, head, and over vanity sink with halogen | ||||||||||||||||||
| 6/8/1996 | Engine work, painted transmission and bracket, spliced out connector and reworked muffler | ||||||||||||||||||
| 6/9/1996 | Head liner project, added flanges (pad eyes) for storm jib, replaced broken hand rail bolt | ||||||||||||||||||
| 6/9/1996 | Replaced lights in the mail salon, center and over the fridge with halogen | ||||||||||||||||||
| 6/14/1996 | Engine, Westerbeak 58 Serial #F23919, Spec. HPW 1T01, over hauled by John Moore of Allied Marine Service, Inc. of San Rafael. $2,617.42 and a page long parts list | ||||||||||||||||||
| 6/14/1996 | Removed starter, heat exchanger, transmission oil cooler, sea water pump, etc. | ||||||||||||||||||
| 6/14/1996 | Boil out, flush, and silver solder heat exchanger | ||||||||||||||||||
| 6/14/1996 | Overhaul sea water pump | ||||||||||||||||||
| 6/14/1996 | Make up fittings and pulley on new sea water pump | ||||||||||||||||||
| 6/14/1996 | Make up spacer and retainer for sea water pump mount | ||||||||||||||||||
| 6/14/1996 | Assemble transmission oil collar fittings | ||||||||||||||||||
| 6/14/1996 | Clean and paint parts | ||||||||||||||||||
| 6/14/1996 | Install all new hoses | ||||||||||||||||||
| 6/14/1996 | Replace exhaust nipple and elbow | ||||||||||||||||||
| 6/14/1996 | Replumbed water heater heat exchanger hoses, per ECN, so hot water routes to house water heater first | ||||||||||||||||||
| 6/14/1996 | Install new transmission oil collar and make up hoses | ||||||||||||||||||
| 6/14/1996 | Install heat exchanger | ||||||||||||||||||
| 6/14/1996 | Adjust valves | ||||||||||||||||||
| 6/14/1996 | Sort out overheating problem | ||||||||||||||||||
| 6/22/1996 | Added a Printer, and Epson Color Styless Pro II, with connectors for both Windows and Macintosh computers | ||||||||||||||||||
| 6/22/1996 | Added a PowerTalk signal processor to the SSB | ||||||||||||||||||
| 6/22/1996 | Connected the AEA Terminal Node Controller (sea going modem) | ||||||||||||||||||
| 6/22/1996 | Added a Garmin 210 GPS with PC interface (stowed Loran) | ||||||||||||||||||
| 6/30/1996 | Replaced the broken wood strip on the midship companionway entrance | ||||||||||||||||||
| 7/2/1996 | Replaced engine thermostat, ordered more spare parts | ||||||||||||||||||
| 7/6/1996 | Added an RCA Camcorder with a PC interface (Snappy) | ||||||||||||||||||
| 7/6/1996 | Replaced the TV/VCR with a new one | ||||||||||||||||||
| 7/7/1996 | Used 2 year old topping lift for main (the new Dutchman main replaced the topping lift) to build a harness for the rigging mount wind generator | ||||||||||||||||||
| 7/23/1996 | Acquired ABI folding Mast Steps for the main mast | ||||||||||||||||||
| 7/24/1996 | Stocked more filters for engine oil and fuel | ||||||||||||||||||
| 7/26/1996 | Ordered spare parts kits for wind generator and water maker | ||||||||||||||||||
| 7/27/1996 | Installed custom shelf unit under companionway entrance (constructed by Heritage Repair) | ||||||||||||||||||
| 7/27/1996 | Further thermostat testing | ||||||||||||||||||
| 7/29/1996 | Ordered Winslow, 6 person offshore life raft | ||||||||||||||||||
| 7/30/1996 | Still trying to get a SCSI interface for computer, Marsha ordered from Iomega, planed to return the Midwest Micro one (failing). New one works | ||||||||||||||||||
| 8/31/1996 | Completed work during haulout at Richmond Boat Works = $6,300 | ||||||||||||||||||
| 8/31/1996 | New Bottom Paint | ||||||||||||||||||
| 8/31/1996 | Replaced zincs | ||||||||||||||||||
| 8/31/1996 | Through hull fittings serviced | ||||||||||||||||||
| 8/31/1996 | Many hose clamps replaced | ||||||||||||||||||
| 8/31/1996 | Replaced front 200 ' anchor chain, 3/8" (not BBC) | ||||||||||||||||||
| 8/31/1996 | Drive Shaft and rudder post packing nuts repacked | ||||||||||||||||||
| 8/31/1996 | Replaced starboard main spreader light fixture and other three spreader light bulbs | ||||||||||||||||||
| 8/31/1996 | Cleaned port forward cockpit drain, plugged with dog hair | ||||||||||||||||||
| 8/31/1996 | Replaced cracked cockpit drain fitting | ||||||||||||||||||
| 8/31/1996 | Installed the folding steps on the main mast | ||||||||||||||||||
| 8/31/1996 | Fabricated a new goose neck for the main boom | ||||||||||||||||||
| 8/31/1996 | Replaced Lifelines | ||||||||||||||||||
| 8/31/1996 | Added 406 EPIRB | ||||||||||||||||||
| 8/31/1996 | Added a Lifesling | ||||||||||||||||||
| 8/31/1996 | Added a propane tank for the grill, aluminum | ||||||||||||||||||
| 8/31/1996 | Added a spare boom vang | ||||||||||||||||||
| 8/31/1996 | Added 18' Para-Tech Sea Anchor | ||||||||||||||||||
| 8/31/1996 | New sheets for aft berth | ||||||||||||||||||
| 8/31/1996 | New snorkeling gear, stowed under clothes hamper | ||||||||||||||||||
| 8/31/1996 | New camping chairs | ||||||||||||||||||
| 9/6/1996 | Installed Winslow Liferaft | ||||||||||||||||||
| 9/6/1996 | Second zip drive | ||||||||||||||||||
| 9/6/1996 | Macintosh Duo 210 exchanged for a Color Duo 280 | ||||||||||||||||||
| 9/6/1996 | 2 Rubbermaid Ice chests for cockpit | ||||||||||||||||||
| 9/6/1996 | More flares for safety kit | ||||||||||||||||||
| 9/6/1996 | Power Survivor Model 06 manual water maker for emergency bag | ||||||||||||||||||
| 9/6/1996 | Snuba Rig, Honda Motor and Air compressor with inner tube mount, 2 - 40' hoses, 2 regulators | ||||||||||||||||||
| 9/6/1996 | Night Scope | ||||||||||||||||||
| 9/6/1996 | Sea of Cortez chart chip for Garmin 210 GPS | ||||||||||||||||||
| 9/6/1996 | Spare primary heat exchanger for engine | ||||||||||||||||||
| 9/6/1996 | Light air vane for Monitor Wind Vane | ||||||||||||||||||
| 9/6/1996 | Spares for Autoprop | ||||||||||||||||||
| 9/6/1996 | Jerry jugs, 4 for diesel, 2 for gasoline | ||||||||||||||||||
| 9/6/1996 | Adaptor for electrical dock connections | ||||||||||||||||||
| 9/6/1996 | Fishing licenses, lures, and spare 30# test line | ||||||||||||||||||
| 10/1/1996 | Vacated apartment on Crestwood Drive, Moved on Spirit full time, Mail service P.O. Box 1000, Knightsen, CA 94548 | ||||||||||||||||||
| 10/6/1996 | Left the dock and headed out the Golden Gate Bridge, turned left. Much more shopping in Sept. prior to leaving: | ||||||||||||||||||
| Zodiac end fittings for pump | |||||||||||||||||||
| Through hull wooden plugs | |||||||||||||||||||
| Water strainer | |||||||||||||||||||
| 100' spare main halyard | |||||||||||||||||||
| 75' spare mizzen halyard | |||||||||||||||||||
| Wheels from dock line roller | |||||||||||||||||||
| 2 gal. Lantern oil | |||||||||||||||||||
| 4 quarts SAE 30 oil for V-Drive | |||||||||||||||||||
| 30 Wt. Oil for Diesel, 2 gal. | |||||||||||||||||||
| Fish stringer | |||||||||||||||||||
| Speakers for cockpit | |||||||||||||||||||
| 100' spring line | |||||||||||||||||||
| 6" O-ring | |||||||||||||||||||
| Black paint for Bomar Hatches | |||||||||||||||||||
| White paint for dinghy | |||||||||||||||||||
| 5/8' male male connector | |||||||||||||||||||
| Tide Tables | |||||||||||||||||||
| Collision Mat | |||||||||||||||||||
| Batteries for fish finder | |||||||||||||||||||
| Running lights for dinghy | |||||||||||||||||||
| 7/8" rubber cane tips for swim ladder | |||||||||||||||||||
| 12 pencil zincs | |||||||||||||||||||
| AC wire | |||||||||||||||||||
| Windproof matches | |||||||||||||||||||
| Spare batons for main, 4 #8, mizzen 4 - 3/4" flat | |||||||||||||||||||
| Kayak Paddles | |||||||||||||||||||
| Spare hose clamps | |||||||||||||||||||
| Bio Bore and Diesel Fuel treatment | |||||||||||||||||||
| 1 Gallon Acetone | |||||||||||||||||||
| Fishing books | |||||||||||||||||||
| Flags, American, Mexican, Quarantine | |||||||||||||||||||
| Fish grill | |||||||||||||||||||
| Stove top toaster | |||||||||||||||||||
| Wash board | |||||||||||||||||||
| Spare circuit breakers | |||||||||||||||||||
| Drill bit set | |||||||||||||||||||
| Lumber for Cindy board | |||||||||||||||||||
| 2-1/2" hole saw | |||||||||||||||||||
| Rheostat volume control | |||||||||||||||||||
| Zip ties | |||||||||||||||||||
| Gasket Material | |||||||||||||||||||
| Extension Cord | |||||||||||||||||||
| Big pair of scissors | |||||||||||||||||||
| Spare bulb for Makita Flashlight | |||||||||||||||||||
| Paint and epoxy for Cindy board | |||||||||||||||||||
| Speaker jacks, male and female | |||||||||||||||||||
| Torx wrenches, #6 and #8 | |||||||||||||||||||
| Masking Tape | |||||||||||||||||||
| Decon Roach Bombs | |||||||||||||||||||
| Egg Timer | |||||||||||||||||||
| Cheese Grater | |||||||||||||||||||
| Hand cleaner | |||||||||||||||||||
| Rechargeable D and C batteries | |||||||||||||||||||
| New wash down hose | |||||||||||||||||||
| 15 copies of Vessel documentation, passports, and fishing licenses | |||||||||||||||||||
| Lantern wicks | |||||||||||||||||||
| Spare strobe light bulb | |||||||||||||||||||
| Black wheels for dock line fairleads | |||||||||||||||||||
| Biocide for water maker | |||||||||||||||||||
| Dinghy lock | |||||||||||||||||||
| Shaft zincs | |||||||||||||||||||
| Spare ignition switch | |||||||||||||||||||
| Luff tape | |||||||||||||||||||
| Underwater dive flashlight | |||||||||||||||||||
| Several pair of blue blocker sun glasses | |||||||||||||||||||
| Keyboard for the Macintosh computer | |||||||||||||||||||
| 10/6/1996 | First day out the gate, the transmission and throttle cable give up the ghost. We get towed into Princeton Harbor by harbormaster | ||||||||||||||||||
| Got introduced to Dillman Benton's Mobile Marine | |||||||||||||||||||
| 10/7/1996 | Pull Transmission, sublet the repair / rebuild to Sea Power including drop off and pickup | ||||||||||||||||||
| 10/8/1996 | * | At this point, I can start adding links to the first web log: | http://www.searspirit.com/bigadventure1/10-8-96.html | ||||||||||||||||
| 10/9/1996 | Cleaned up Trans Oil Cooler, installed transmission and cooler. Too late to run engine | ||||||||||||||||||
| 10/10/1996 | Finished hook up on genset, shafts, linkage, hoses. Discovered broken shift cable, customer to order new, Ran engine, checked leakage | ||||||||||||||||||
| 10/11/1996 | Installed new cables, disassembled binnacle, found shift bracket not workable. Customer to have one fabricated | ||||||||||||||||||
| 10/11/2006 | Returned from HMB, finished fabrication in installed new shift and throttle cables, adjusted shift and new Edson binnacle and control levers | ||||||||||||||||||
| Adjusted steering cables, reseated w/p hose. | |||||||||||||||||||
| Customer bought new fuel fittings and hose for future use | |||||||||||||||||||
| 10/12/1996 | Finished up, paid by check, $1,251.17 | ||||||||||||||||||
| 10/12/1996 | Underway again, to an end tie for the evening in Santa Cruz harbor. We get T boned by a drunken sailor coming in after dark | ||||||||||||||||||
| This was cause for another 2 week delay while Homer Lighthall made repairs to the damaged teak and fiberglass, port bow | |||||||||||||||||||
| 10/17/1996 | * | http://www.searspirit.com/bigadventure1/10-17-96.html | |||||||||||||||||
| 10/18/1996 | Monterey Bay Marine serviced V Drive (including screwing in a zinc pencil into one of the plug / chambers) and helped me install a new Shaftloc shaft brake | ||||||||||||||||||
| 11/4/1996 | Bedded water cooling chamber in V-Drive with Marine Tex, then Aluminum epoxy after cleaning out that crap that develops after 15 years of mixing sea water with iron without a sacraficial zinc | ||||||||||||||||||
| San Diego | Had the running back stays on main recut to proper length | ||||||||||||||||||
| La Paz | Rigged main boom preventer system with lines leading to the cockpit | ||||||||||||||||||
| Upgraded the alternator to a 134 amp double pulley | |||||||||||||||||||
| Had 104 Amp alternator rebuilt (new diodes and winding) and added double pulley to be the spare | |||||||||||||||||||
| Replaced sanitation hose from head to outlet | |||||||||||||||||||
| Had all bungs in teak replaced. This job included replacing the round head screws used in the starboard forward quarter of toe rail. | |||||||||||||||||||
| Puerto Escondido | Added additional depth sounder, the kind that sounds through the hull | ||||||||||||||||||
| San Carlos | Epoxy bottom job on hull | ||||||||||||||||||
| Interior varnish, Interlux Satin Rubbed Effect (trim in galley is same but not stirred so it is glossy. | |||||||||||||||||||
| 7/2/1999 | Sprit returns to bay area on a truck | ||||||||||||||||||
| 11/23/2002 | We moved back on Spirit as liveaboards | ||||||||||||||||||
| 7/99 - 04 | Added teak box mounted on wall in Nav Station | ||||||||||||||||||
| Added teak kleenix holder in aft stateroom | |||||||||||||||||||
| 04/?/02 | Painted the inside of the interior hatches | ||||||||||||||||||
| Mounted cedar on the bulkheads in the center and forward hanging lockers | |||||||||||||||||||
| Oct-02 | Replaced Adler Barber SuperCold Refrigerator | ||||||||||||||||||
| 08/?/05 | Replaced Propane Grill with larger one | ||||||||||||||||||
| Added shelf for computer monitor, starboard main salon | |||||||||||||||||||
| Replaced microwave with a larger one | |||||||||||||||||||
| Added convection, 6 slice toaster oven | |||||||||||||||||||
| Replaced all of the large hella fans with the new 5000 hour white model, fore and aft berth, port and starboard bulkhead in main salon | |||||||||||||||||||
| Installed 12 volt light in forward hanging locker | |||||||||||||||||||
| Replaced 1500 watt inverter and added wall mount switch panel | |||||||||||||||||||
| Added new light in the nav station | |||||||||||||||||||
| Had outboard motor rebuilt | |||||||||||||||||||
| New cover for outboard motor | |||||||||||||||||||
| Replaced solar vent for engine compartment with stainless model | |||||||||||||||||||
| Had a one piece lexan window replacement for companionway entrance boards made | |||||||||||||||||||
| Replaced cushion on nav station seat | |||||||||||||||||||
| 2005 | Added track lighting in main salon | ||||||||||||||||||
| Installed a Raritan Lectra/San waste treatment system | |||||||||||||||||||
| Installed a 23" Sony HD LCD Television - WOW! | |||||||||||||||||||
| Installed a teak wine glass holder in galley over sink | |||||||||||||||||||
| 1/22/2006 | Replaced the Gel Starter Battery | ||||||||||||||||||
| 1/24/2006 | Upgraded to a much larger dehumidifier - WOW! | ||||||||||||||||||
| 1/26/2006 | Replaced the shower sump pump | ||||||||||||||||||
| 2/15/2006 | Replaced propane tank | ||||||||||||||||||
| 3/5/2006 | Replaced Raritan Hot Water Heater (after waking up to a flashing red automatic bilge pump light - city water | ||||||||||||||||||
| 3/5/2006 | Changed engine zinc | ||||||||||||||||||
| 3/18/2006 | Hauled out, bottom paint - 2 coats (2-1/2 gallons) Pettit Trinidad Red | ||||||||||||||||||
| Had fixed prop reinstalled | |||||||||||||||||||
| Replaced masthead tri-color navigation light fixture | |||||||||||||||||||
| New light bulbs in all 4 spreader lights | |||||||||||||||||||
| New steaming light | |||||||||||||||||||
| 3/26/2006 | Replaced Aluminum propane tank for grill with new one with overfill protection valve | ||||||||||||||||||
| 3/27/2006 | Added extension power cord for separate AC circuit (through anchor locker bulkhead) | ||||||||||||||||||
| 5/14/2006 | Changed oil filter, and Fram, Raycor, and Westerbeak fuel filters | ||||||||||||||||||
| 8/1/2006 | Began bright work with Lewis of Y and Y | ||||||||||||||||||
| Cetol, 2 coats on exterior teak, including sanding before coats | |||||||||||||||||||
| Deck and hull, wet sand, rub and polish, wax | |||||||||||||||||||
| Stainless polished | |||||||||||||||||||
| Painted aluminum port lights, exterior | |||||||||||||||||||
| Painted aluminum hatches | |||||||||||||||||||
| Dock box, replaced tops with 3/4" plywood and painted | |||||||||||||||||||
| 9/10/2006 | Lubricated Bimini zippers | ||||||||||||||||||
| 10/22/2006 | Dove on bottom, put 2 new zincs on prop shaft, cleaned hull | ||||||||||||||||||
| 1/29/2007 | Repaired head (for the moment) Added an additional O Ring underneath the plastic ring around the plunger | ||||||||||||||||||
| 3/31/2007 | Installed new electric head, the Raritan PHE-II. It easily converts to manual operation. | ||||||||||||||||||
| This required replacing the base under the heat. I had a new one made at | |||||||||||||||||||
| H and H Cabinets on 8th street in Oakland for $260. | |||||||||||||||||||
| The old base was shot, so this got rid of the ugliest thing on the boat. | |||||||||||||||||||
| There is a 25 amp fuse in the positive line near the terminal strip. | |||||||||||||||||||
| 11/1/2007 | The halogen light fixtures I installed in the main salon aren't holding up. | ||||||||||||||||||
| I ordered 3 new fixtures that take 12 volt light bulbs, the kind with 120 volt sockets in a house. | |||||||||||||||||||
| I replaced the dead starboard mid fixture, and for now put the 2 extra fixtures in the forward | |||||||||||||||||||
| starboard hatch above the settee. | |||||||||||||||||||
| West Marine #255935 Cabin Lights - Bulkhead Lamp (40W), $34.99 each plus 3 20 Watt bulbs | |||||||||||||||||||
| 12/1/2007 | Replaced the Seagull IV cartridge, part number 788150 and ordered a replacement | ||||||||||||||||||
| 800-441-8166, General Ecology, Inc. | |||||||||||||||||||
| 12/28/2007 | Replaced the Lectra/San's motor. Salt had gotten through the shaft seal and eventually destroyed the motor. | ||||||||||||||||||
| Also replaced the shaft seal. | |||||||||||||||||||
| 9/21/2008 | Replaced the faucet in the galley. This involved learning how to remove the sink. | ||||||||||||||||||
| 9/25/2008 | Replaced the DVD player with a thinner model. It's thin enough to fit in the TV compartment. | ||||||||||||||||||
| This freed up space in the forward hatch the old one used to be in. Now we don't have to aim | |||||||||||||||||||
| the remote control at the mast to ricochet the signal forward. | |||||||||||||||||||
| 9/28/2008 | Replaced the Lectra/San with the new Electro/Scan model. Serial number ES0004810708. | ||||||||||||||||||
| Remember to unscrew the discharge hose fitting, don't try to get the hose off the barb. | |||||||||||||||||||
| 12/4/2008 | Had the Refrigerator charged. The evaporator on the Adler Barbour Super Cold Machine | ||||||||||||||||||
| was only frosting up on one side. It required 2-3 oz of refrigerant. No leaks were detected, | |||||||||||||||||||
| John Poole, 510-523-3495 used a high tech sniffer. It's possible when I poured hot water down | |||||||||||||||||||
| the sides to defrost it quicker, some expansion of some joint occurred causing the leak. | |||||||||||||||||||
| It's working normally now. | |||||||||||||||||||
| 9/30/2009 | Had the refrigerator charged again by Anderson Refrigeration (recommended by Rick, turns | ||||||||||||||||||
| out to be John Poole's partner.) He couldn't find a leak either, topped off the charge a little bit. | |||||||||||||||||||
| As of 1/3/2010, still working normally. Air bubble? | |||||||||||||||||||
| 12/12/2009 | Replaced shower sump. There were too many things suspect with the old one. The new | ||||||||||||||||||
| one no longer has the float switch design. | |||||||||||||||||||
| 5/28/2010 | Spirit got hauled out for a bottom paint job. We had the stuffing box repacked as well. | ||||||||||||||||||
| Took Spirit to Grand Marina on 5/23/10, got hauled on 5/24/10, splashed on 5/28/10. | |||||||||||||||||||
| Then back to Marina Village on 5/29/10. Two nights on board in Grand Marina. | |||||||||||||||||||
| 5/30/2010 | Replaced the broken down old Cybernet Stereo with a new Sony AM/FM/CD/MP3 with | ||||||||||||||||||
| aux input for ipod or computer. Model CDX-M10 | |||||||||||||||||||
| 6/10/2010 | Had the refrigeration system fixed this time. Neil Calvert of All-Marine Electronics & Electrical | ||||||||||||||||||
| Systems did a fantastic job. He's a marine electrician that knows Adler Barbour Cold | |||||||||||||||||||
| Machines from working on his own boat. He put a pressure gage on the suction (top) | |||||||||||||||||||
| It was drawing more vacuum than it should have - should not have gone into a vacuum | |||||||||||||||||||
| state, below 0. Then he put a gage on the pressure side - too much. It should not | |||||||||||||||||||
| have read above 120 psi or so, it was over 150. Both data points indicated blockage | |||||||||||||||||||
| likely where the refrigerant either evaporates or condenses. Here is the statement on the | |||||||||||||||||||
| invoice: | |||||||||||||||||||
| Troubleshot supercold machine refrigeration system. Found loose fitting at pressure side | |||||||||||||||||||
| fill port. Tightened fitting. Pumped down, and recharged system. All check ok now. | |||||||||||||||||||
| Fully charged - All Check OK. Refrigerant R-134A - 12oz. Labor = 5 @ 60. | |||||||||||||||||||
| Awesome work Neil! - Steve Sears | |||||||||||||||||||
| 8/1/2010 | Replaced the 2 4D Gel House batteries with Rick's. He switched to AGMs. One is | ||||||||||||||||||
| 10 years old, the other is 2 years old. I believe we put the newer one in the outer | |||||||||||||||||||
| box. I let the 16 year old gels we took out sit on the dock, then measured the | |||||||||||||||||||
| voltage 6 weeks later. 12.98 and 13.02. ???? | |||||||||||||||||||
| 10/2/2010 | Well, the refrigerator stopped cooling 2 days later. Neil spent the summer debugging | ||||||||||||||||||
| it while we were away. The problem turned out to be a pin hole corrosion leak in the | |||||||||||||||||||
| evaporator. Replaced the evaporator. It's been working now for the past 4 days. | |||||||||||||||||||
| 12/26/2010 | Replaced Seagull water purifier cartridge | ||||||||||||||||||
| Replaced hinges on V-berth door | |||||||||||||||||||
| 11/30/2011 | Replaced light in nav station with LED strip, white rectangular switch visible up and under switchpanel | ||||||||||||||||||
| Replaced toilet paper holder | |||||||||||||||||||
| 4/24/2012 | Replaced Electrode in Electra Scan, works like new | ||||||||||||||||||
| Replaced Whale Gusher Galley Pump, MK3 | |||||||||||||||||||
| Replaced Magma Grill burner | |||||||||||||||||||
| Replaced Head seal, Raratan PHE-II, part #1214-A | |||||||||||||||||||